Bathroom plumbing installation and repairs across Cardiff and South Wales
Whether you're fitting a new basin, replacing a bath, upgrading a toilet or sorting pipework behind the scenes, Cardiff Plumbing Limited installs it properly, tests it and leaves the room clean. You get a clear price before we start.
- Proper waste and supply connections
- All work meets Building Regulations
- Fully insured and qualified
Questions, answered
Do you need Building Regulations approval for bathroom plumbing work?
Yes. Any new bathroom installation or major plumbing changes must be notified to your Local Authority under Building Regulations Part G and Part H. We handle the paperwork and inspection for you. Minor repairs like fixing a tap don't usually need approval, but new suites, waste pipes and hot water systems do. Building Regulations certification protects the house's value and your insurance if anything goes wrong.
Can you fit a new bath or basin in my existing space?
In most cases yes. We measure the room, check the wall strength and existing pipework, then work out how to fit the suite you want. Sometimes the new bath or basin is a different size or shape from the old one, which may mean moving pipes or adjusting walls slightly. We always visit first to confirm it's possible and explain what's involved.
How long does a full bathroom plumbing installation take?
A bathroom with new basin and toilet typically takes 1–2 days. Adding a bath, shower tray or significant pipework changes takes 2–4 days. If we have to chase pipes into walls, make good damaged plasterboard or undercut door frames, that extends the job. We always give you a realistic timescale before we start, and you'll see progress at the end of each day.
What's the difference between a pedestal basin and a vanity unit?
A pedestal basin is a traditional look — the basin sits on a single pillar and the pipework is hidden behind. A vanity unit is a cabinet with the basin set into the top; storage fits underneath and the pipes run through the cabinet. Pedestal basins take up less visual space and cost less; vanity units give you storage but need a bigger footprint and a stronger wall to support the weight when filled.
What should I do about a slow-draining bath?
First, clean the waste trap and remove any hair or debris blocking it. If that doesn't fix it, the problem is usually further down the waste pipe — a bend clogged with soap and scale, or a corroded section of pipe. We can clear most blockages with a drain rod or pressure flush, but if the pipe is damaged inside, we'll recommend replacing that section of pipework. Left alone, slow drainage gets worse and can back up completely.
Can I keep using my bathroom while the work is being done?
Not usually. We need to isolate the water supply and usually work on the waste pipe too, so the bathroom is out of action for the duration of the job. For a simple tap or toilet repair that can often be done in a couple of hours, we'll keep disruption minimal. For a full suite installation, plan on 2–4 days without the bathroom. We'll always give you an honest timescale and work as quickly as we can.
Everything in a complete bathroom plumbing installation
- Planning the pipework layout to minimise cutting and chasing
- Isolating the water supply for the room or the whole house if needed
- Removing the old suite safely and disposing of it properly
- Making good the wall or floor where the old unit was
- Installing new supply pipes (copper or plastic) sized for the appliances
- Fitting new waste traps and venting the pipes correctly
- Securing the new basin, bath or toilet to walls or floors with the right fixings
- Testing all connections under pressure and checking for leaks
- Flushing the system to remove debris and swarf
- Checking hot and cold are on the right sides
- Clearing up and checking everything works before we leave
If you've chosen a basin or bath already, tell us the make and model so we can check the dimensions and fixing points before the job starts.